Architecture Review

Kingstream Community Council​

It is preferred that applications are scanned as a single .PDF document and emailed to Lisa@SpectrumPropertyMGT.com however, they may also be sent by mail to the address on the application.

All exterior changes to Lots must be approved in writing by the Architectural Review Committee prior to the commencement of any project. Examples of items that need approval are (but not limited to): new siding, changes of exterior paint colors, driveway expansions, installing and shed or fence, major landscaping changes, etc.

If you are unsure of whether or not you need approval, please contact us. It’s always best to check and be sure rather than have to undo or change something you’ve already completed. There detailed instructions in the ARC Guidelines for what information is required to accompany the ARC application. Generally speaking, applications should also include: a plat of the lot identifying the location of the proposed addition or change, color samples, brochures or website links showing  a sample of the proposed items/materials to be installed, and other details such as size, height width etc.


Once a complete application has been submitted, the ARC Committee has 30 days to review. After the committee has reviewed your application, you will receive notification from the property manager as to the approved or denied status. If your application is denied, please see the ARC Guidelines for the denial appeals process.